int(831)

Specific
questions.

How does the eNX® system support variations in the work programme?

GP Progetti’s system allows the required changes to the production plan to be made quickly and flexibly by drag-and-drop, with evidence of them both in production and in purchasing/accounting, as well as automatically and immediately reflecting any changes in the factory data system (MES).