preloader

eSphere®.

Download sheet

Thanks to the Omni+ algorithm, eSphere® allows production scheduling to be synchronised with supplies to maximise production efficiency. 

In fact, in the eNX® environment, finite capacity scheduling is performed by means of the integrated dynamic MRPII (manufacturing resource planning), which allows us to verify the real possibility of carrying out the operations required by the production plan.

eSphere® is designed to manage production according to the best lean manufacturing theories and to increase the performance of companies through its multiple functionalities:

  • Interactive Gantt chart
  • Finite capacity scheduling of production orders and visualisation of the workload distributed over the different resources, according to their actual availability
  • Using components dynamically
  • Managing multi-pallet resources
  • Multi-link and multi-level processing order management (precedence and succession)

eSphere® allows flexible production management: it is possible to know the future impact of every single change made to the schedule in advance and in a matter of seconds:

  • Comparison between scheduling with standard times and actual times
  • Possibility of running simulations
  • Omni+ algorithm with different optimisation possibilities: set-up, operators, materials, etc.

The user-friendly interface is designed to allow the use of the touch screen and to make any changes immediate. eSphere® also comes with several utilities, designed to make production management in the company as simple as possible. 

The eSphere® Omni+ algorithm brings the evolution of Just in Time to your company. eSphere® is the tool designed for optimal production management, based on the lean thinking philosophy.

eSphere® enables advanced, real-time company production management through a fully integrated database: with each change in planning, Omni+ automatically and quickly recalculates the impact of operational and tactical decisions on the production process.

eSphere® enables finite capacity management:

  • Resources
  • Material
  • Equipment
  • Technicians
  • Operators